Hospitality

The most demanding use of natural stone, and the one it was made for.

A hotel asks more of stone than any other building type. The same material may appear in a lobby floor, a bar front, a spa wet area and eighty bathrooms — each with different traffic, moisture, cleaning chemistry, maintenance budget and finish requirement.

The specification work is therefore not choosing a beautiful slab. It is making one material behave correctly in five different conditions, keeping it visually coherent across every one of those rooms, and holding enough of it to finish the job eighteen months after the first delivery.

Those are three different problems. The first is design, the second is grading, and the third is supply. A hospitality project fails on whichever of them nobody owned.

By area

What each space needs

Working together

How a hospitality project runs

It starts with the requirement, not the catalogue: areas, quantities, finishes, phasing and the delivery window. We come back with what exists for that, how it will behave in each area, and what has to be committed now in order to exist in phase two.

Lots are then held against the project as the design develops, so that the material specified at concept is the material available at construction. Inspection is documented per lot. Delivery is phased to the site programme rather than to our convenience, because stone delivered early is stone stored badly.

The moment that decides a hospitality project is rarely the selection meeting. It is the point, months later, when someone needs forty more square metres to match — and either the material was reserved, or it was not.

Consistency across three hundred rooms is a supply decision, taken long before installation.

Questions

What operators and designers ask

  1. Can you match material across a phased build?

    Where the material is reserved at the outset, yes — that is what lot-level control is for. Where a project returns eighteen months later having reserved nothing, matching becomes a question of what remains rather than what is wanted. The honest answer is always given before commitment, not after.

  2. What finish should go in a spa or pool surround?

    A textured finish specified against a tested slip value on the material actually being supplied, wet — not a finish chosen from a sample seen dry in a showroom. Unfilled travertine in particular should not be used underfoot where it will stay wet.

  3. How do you keep eighty bathrooms looking like one scheme?

    By reserving enough of one lot, assigning variation honestly at the start, and sequencing delivery so that rooms completed months apart come from the same material. The tone shift guests notice between floors is almost always a supply failure, not a quarrying one.

  4. Do you work with the contractor or with us?

    Either. Specification usually runs with the designer and the operator, procurement with the contractor. What matters is that the lot record follows the material through both, so approval at design and delivery on site refer to the same thing.

  5. Will our hotel appear in your marketing?

    Not unless you ask us to. Client projects, drawings and quantities are confidential by default, in the same way that our source sites are. If we would like to show a project, we ask first, in writing.